Structural strengthening, concrete remediation and waterproofing of an iconic building in the heart of Perth’s CBD.

Located at 27–29 St Georges Terrace, the landmark Council House building is undergoing Stage 2 structural remediation works to address water ingress, repair deteriorated concrete and increase the live-load capacity of the northern forecourt slab. Duratec is currently delivering the project for the City of Perth.

The multidisciplinary scope includes demolition, concrete remediation and structural strengthening, structural repairs, waterproofing, electrical works, landscaping and fire-related works.

Delivering these works within a prominent CBD location has required careful planning around latent conditions and program pressures. Unidentified conditions discovered within the forecourt have added complexity as the works have progressed, requiring the team to adapt its approach while maintaining momentum.

A staged construction methodology was implemented to improve productivity and coordinate the different work fronts. Early procurement and subcontractor engagement helped secure critical resources, while engineered temporary works and propping were introduced to accommodate increased load requirements. This enabled larger plant and equipment to operate within the work area and supported more efficient delivery.

The team has also used mechanical aids, including motorised wheelbarrows and conveyor systems, to reduce manual handling and improve the movement of materials around the constrained site.

Works completed or underway include excavation and demolition within the forecourt, concrete breakout at the ramp, remediation of the basement car park soffit and specialist asbestos-removal activities conducted within a purpose-built encapsulation unit.

As the project progresses, Duratec continues to work closely with the City of Perth, maintaining transparent communication as latent conditions and evolving site requirements are addressed. Once complete, the structural remediation of the forecourt and basement for this well-loved building is intended to resolve water-ingress issues and increase the live-load capacity of the northern forecourt slab.