Duratec were contracted by Boskalis Australia to assist with the installation of a nib wall adjacent to the Tug Boat harbour on the MOF Wharf.

Details

The works were to include: joint sealant application between each element; grouting of the joint between the elements; and patching of lifting eye recesses.

Duratec were able to provide a proprietary pre-batched grout and repair mortar solutions which eliminated the need to batch on site, ensuring high quality was achieved.
Additionally, Duratec was able to provide the labour to assist with the installation of the blinding layer and placement of nib wall elements.

Highlights

  • The works were completed in one swing on Barrow Island.
  • Duratec’s crew were commended for the exemplary safety attitude that they displayed on site.