Our Framework

The Critical Risk Controls Framework defines how we identify and manage high‑consequence risks that could result in fatal or life‑changing outcomes if not effectively controlled. It establishes a clear expectation that critical risks must be identified before work starts, with mandatory controls in place and verified, and that work will not proceed if those controls are missing or ineffective. 

The framework is structured across four aligned layers – Principles, Standards, Procedures, and task‑level tools such as SWMS and JHAs. Together these define what must be achieved, the minimum controls required, who is responsible, and how work is safely executed, ensuring consistency in high‑level expectations for the safe delivery of works.

Our commitment is to set a consistent standard, control critical risks, and enable safe outcomes across all operations. By embedding minimum requirements, clear accountability, and a strong stop‑work culture, the framework supports a proactive approach to preventing serious harm and reinforces our commitment to protecting our people.

 

Critical Risk Standards

Temporary Works

All temporary works shall be designed, installed, verified, and inspected by competent persons in accordance with approved plans and specifications.

Types of temporary works

Temporary works include (but are not limited to):

  • Ground support systems
  • Propping and jacking systems
  • Formwork and falsework
  • Temporary access systems
  • Scaffolding
  • Mobile crane pads and tower crane bases, grillages, ties, etc.
  • Anchor points for suspended platforms and rope access personnel

Design

  • All medium and high complexity temporary works require a design brief
  • A qualified designer shall design temporary works
  • Consider existing structures and foundation conditions
  • Maintain detailed up-to-date drawings and plans
  • All design changes shall be authorised by the designer prior to installation

Installation & Dismantling

  • Temporary works must be installed by competent person(s) as per the design and/or installation instructions
  • SWMS for the installation and dismantling of temporary works must include controls for the work to be completed safely, including preventing persons or objects falling and penetration management

Verification & Handover

  • Prior to use, temporary works shall be verified as installed as per design by a competent person
  • Verification and handover inspections are to be recorded using approved Inspection and Handover checklists

Inspection & Maintenance

Temporary works shall be inspected by a competent person:

  • As per designer and/or manufacturer’s requirements, relevant legislation, Codes of Practice, Australian standards, etc.
  • Following events that may affect stability
  • Complete inspection records on approved inspection checklists

Emergency Response

Emergency response shall consider:

  • Injury during erection and dismantling
  • Collapse of temporary works
  • Damage to permanent works
  • Access and egress of emergency equipment and retrieval of injured workers
  • Maintain emergency access and egress to work areas

PRO-HSEQ-27 Temporary Works

 

Return to top


 

Scaffolding

Scaffolds shall be erected, inspected, maintained, and verified as safe for use by competent persons in accordance with the design, applicable standards and legislation.

Planning & Design

  • Identify operational needs for scaffold and add to design brief
  • Ensure designer is qualified to the complexity outlined in Temporary Works procedure
  • Scaffold plans include layout, tie-in details, suitability of foundations and structures, etc.
  • Consider Emergency Response during erection, regular use and dismantling

Competency & Licensing

  • Personnel erecting, dismantling or modifying scaffold 4m or above hold relevant Scaffold High Risk Work License (HRWL): Basic, Intermediate or Advanced
  • VOC (or equivalent) is required for scaffold less than 4m high
  • Personnel operating or working in Swing Stage require an induction and Working at Heights competency (QLD requires specific training)

Erecting & Dismantling

  • Follow safe erection/dismantling sequence including risk assessed fall prevention method
  • Do not drop or throw materials between levels or to the ground
  • Use safe lifting and lowering methods for gear, e.g. Ropes, baskets
  • Display signage and restrict access during construction
  • Mandatory use of universal lift-off preventer or an approved Layher alternative clamp with Layher scaffolding

Handover & Inspections

  • Competent workers are to inspect and document scaffold prior to use, at regular intervals not exceeding 30 days (or as per risk assessment), or after adverse weather or incident
  • New or modified scaffolds require a Handover Certificate
  • All access points require a scaffold tag with duty rating and date of last inspection
  • Maintain the Scaffold Register

Height Safety Equipment

  • Where there is a fall risk of 2 or more metres, wear safety harnesses with lanyards attached to rated anchor points
  • Anchor points rated to 15kN (1 person) or 21kN (2 persons)
  • Secured industrial safety nets may be used below work platforms (no more than 2m high)
  • A PFD and a harness with lanyard anchored independently of scaffold system shall be worn when working over water

Swing Stage

  • Only Advanced Scaffolder or Advanced Riggers may erect, modify and dismantle Swing Stages
  • Advanced Scaffolder (or Experienced Engineer in QLD) shall complete inspections using and record results on Swing Stage Handover Certificate prior to use
  • Prior to use, complete Swing Stage Pre-start inspection before work begins

PRO-HSEQ-49 Scaffolding

Return to top


 

 

Working at Heights

Falls from height risks are identified, assessed and controlled in accordance with the Falls from Height Hierarchy of Control, with effective fall control systems implemented, verified and maintained by competent workers.

Planning

  • Apply the Falls from Height Hierarchy of Control to identify, assess and control fall risks
  • All work at height must have an approved SWMS that addresses fall hazards and controls
  • A Working at Heights Permit is required before work commences to ensure fall controls are identified, planned and verified
  • A task-specific rescue plan must be developed and communicated before work begins
  • Ensure all personnel working at height are suitably trained

Access, Egress & Edge Protection

  • Provide safe, clear and well-lit access and egress to all access platforms and systems
  • Use access systems suited to the work area, including secured ladders or compliant stairs
  • Design temporary access systems for anticipated loads in accordance with the Temporary Works Procedure
  • Protect open edges with guardrails: Top rail 900–1100mm, mid-rail 500mm and kickboard ≥150mm
  • Fit self-closing gates at access points. Safety chains may mark safe distances but must not replace compliant edge protection

Penetrations & Openings

  • Cover all open penetrations with suitably rated material and signpost
  • Include penetration risks in SWMS and risk assessments
  • Do not travel mobile equipment over penetrations unless covered with rated steel plate
  • Secure a hatch cover or rail to prevent falls through a work platform’s access openings

Fall Arrest and Restraint Systems

  • Prioritise fall restraint systems over fall arrest systems to prevent exposure to a fall (where possible)
  • Where Fall Arrest is used, harness with lanyard must limit fall distance to a maximum of 2m
  • Inspect and tag harnesses, lanyards and associated fall protection equipment quarterly using a person who holds either Working at Height competency, PAUEQU001 Height Safety equipment Inspection or Intermediate Rigger.
  • Personnel using fall protection equipment shall hold a current Working at Heights competency, completed within the previous two years

Access Systems

  • Do not work from ladders (except platform ladders)
  • Portable ladders are minimum 120kg load rating
  • EWP operators hold competency for EWP class
  • Boom-type EWP >11m requires High Risk Work Licence (HRWL) and DOC training for scissor lifts
  • Personnel working in Building Maintenance Units (BMUs) to hold Working at Heights qualification and wear Safety Harness
  • Induct the operators controlling Mast Climbers into safe operation
  • Have a Critical Lift and Working at Heights Permits in place when using Workboxes

Rope Access

  • Basic rope access work needs at least two IRATA technicians, including one IRATA Level 3. More complex tasks/manning requires a larger team size and IRATA Level 3 coverage (as needed)
  • Equipment is maintained, traceable and inspections recorded
  • Use Hierarchy of Rope Protection to identify and mitigate damage to ropes
  • Independently secure and anchor tools and equipment >8kg
  • Develop and approve Rescue Plans prior to starting works

PRO-HSEQ-17 Working at Heights

Return to top


 

Falling Objects

Falling object risks are identified, assessed and controlled through the Hierarchy of Control, including exclusion zones, containment, tethering, and securing materials.

Risk Assessment

  • Assess and document falling object risks in a risk assessment and implement adequate controls
  • Sources of falling objects include:
    • Personnel working with tools and material at height
    • Objects falling from cranes, forklifts, warehouse/workshop shelving, etc.
    • Objects or material falling into confined spaces or excavations

Overhead Protection Systems

  • If a falling object risk exists and an effective exclusion zone can’t be established, use an overhead protection system
  • Suitably designed and rated catch platforms and components may be used at higher points
  • To prevent object deflection into adjoining areas, install gantry/hoardings suitably designed and rated for public access areas

Height Access Systems

  • Install drop mats or containment systems on work platforms to stop objects falling through gaps
  • Ensure toe boards are fitted to prevent tools, material and equipment from falling over platform sides
  • Install containment sheeting to stop materials from blowing off high work platforms
  • Maintain good housekeeping, regularly removing excess materials and waste

Exclusion Zones

  • Erect barricading to delineate the drop zone. Consider object deflection and wind conditions when determining the exclusion zone’s boundaries
  • Install hard barricading in public/high-risk areas
  • Place signage around perimeter
  • Erect barricading with a minimum height of 900mm

Tools & Equipment

  • Connect specialist tool lanyards to all tools and equipment used at height (including removable batteries)
  • Attach suitably rated tool lanyards
  • Inspect all tools, equipment and attachment points prior to use
  • Tools and securing equipment shall not be modified
  • Keep all tools and equipment in secured toolboxes, bags or containers when not in use

 PRO-HSEQ-19 Dropped Object Prevention and Protection

Return to top


 

Cranes and Lifting

Plan all lifts, use competent personnel, verify equipment and ground conditions, maintain exclusion zones, and never place any part of the body under a suspended load.

Planning

A Critical Lift Permit is required for lifts that are:

  • More than 85% of crane capacity
  • Loads over 20T
  • Using more than one crane
  • Near to live services
  • In heavily populated work areas
  • Lifting of personnel in workboxes
  • Instructed by Project Manager or above

Crane Set-Up

  • Outriggers set per load chart and operator’s manual
  • Don’t set up near trenches, excavations or embankments without engineering approval
  • Engineering assessment required for critical lifts or poor ground conditions
  • Display current WorkSafe/Crane Safe registration

Training & Competency

  • Crane or Forklift Operators to hold relevant High Risk Work Licence (HRWL)
  • Duty of Care training required for earth moving equipment and telehandlers e.g. VOC, Registered Training Organisation (RTO)
  • Lifting loads >3T with earth moving equipment of a telehandler with jib requires a HRWL
  • A dogman or rigger with the suitable HRWL is required whenever judgement is needed to select and inspect lifting gear or sling a load, or when directing a crane or hoist operation whose view of the load is blocked

Operating Conditions

  • Stop operations in wind speeds as per operator’s manual or during lightning activity
  • Establish positive communication by two-way radios or hand signals
  • Daily Pre-start inspection on all lifting plant and equipment
  • Load charts and operations manual to be available

Lifting Equipment

  • Proof Load Testing completed prior to the equipment’s first use and after any major repairs, alterations or modifications
  • Quarterly inspection and tagging to be done by person holding Dogman HRWL and maintained on Lifting Equipment Register
  • Faulty or defective equipment must be tagged out of service and quarantined

Suspended Loads

  • Inspect loads for damage and unsecured items
  • Lift loads from rated lifting points or basketed
  • Tag lines must be used (≥16mm synthetic). Never attach to rigging gear
  • Risk assessment required for hands-on guiding within 300mm of placement
  • Never place any part of the body under a suspended load
  • Establish exclusion zones for crane and load path

PRO-HSEQ-15 Lifting Rigging and Crane Operations

Return to top


 

 

Excavation

Identify services, assess and control ground stability, maintain safe access and egress, and manage working conditions in excavations.

Services

  • Excavation and Penetration Permit to be issued when excavating within 2m of a service or when drawings are unavailable
  • Identify services using BYDA, drawings or locator devices
  • Potholing is required within 2m of known services or when services are expected on site, and accurate drawings are unavailable
  • Use spotters during mechanical excavation
  • Maintain controls to keep mobile plant clear of live services (including overhead)

Ground Stability

  • Excavations below footings or near buildings are to be assessed by a suitably qualified engineer
  • Benching/battering to be suited to ground conditions and comply with Codes
  • Where excavations >1.5m can’t be benched, battered or where the risk of collapse is identified, appropriate ground support systems are required, e.g. Shoring
  • Regular inspection and assessment of excavation stability to be conducted

Ingress/Contamination

  • Water ingress from ground water, surface drainage and watercourses etc. to be identified and controlled
  • Stop Work process in place where contaminated soil is identified
  • Beware the introduction of atmospheric contaminants from sources such as Gas or Diesel fumes. Identify these hazards and manage accordingly, e.g. Use of electric generators in excavations

Working Near Excavations

  • Maintain an exclusion zone of minimum 1m beyond the excavation’s ‘zone of influence’ for plant, materials and spoil (unless ground support is in place)
  • Only plant, equipment and materials directly involved in works may enter the ‘zone of influence’
  • Apply controls to keep mobile plant clear of live services (including overhead power lines)
  • Install barriers where excavations are next to frequent plant or pedestrian movement

Establishing Work Zones

  • Barriers and signage to be placed a minimum of 1m back from excavations
  • Determine the barrier type via the nature of works and site conditions:
    • <1.5m bunting/flagging where public and other site personnel not at risk
    • >1.5m hard barricade/hoarding minimum of 900mm
  • Danger Signage (Do Not Enter or Deep Excavation) placed around excavation barrier

Deep Excavations

  • Excavation Permit required for all excavations >1.5m
  • Provide safe access and egress in trenches via ladders or other approved means at a maximum of 30 metre intervals. Ensure no worker is >15m from an access/egress point
  • Install working at height barriers where the risk of falling is >2m
  • Implement controls to protect workers in the excavation from falling objects, e.g Trench boxes extending above the trench edge, guardrails/toe boards around working edges

PRO-HSEQ-20 Excavation and Penetration

Return to top


 

Mobile Plant

Separate people and plant, implement safe systems of work, and ensure equipment is inspected, maintained, and operated by competent persons.

Selection & Work Areas

  • Plant risk assessment required for all plant e.g. Assess ROPS and FOPS requirements
  • Complete pre-mobilisation checklists prior to operating equipment
  • A SWMS must be completed before operating plant to assess site-specific risks, including ground conditions, overhead services, and travel path gradients etc.
  • Plant to be suitable for operations, e.g. Enclosed Cabs/Cages for demolition, all terrain plant
  • Develop a Traffic Management Plan outlining plant operating areas, and delineate pedestrian/vehicle movement and exclusion zones

Mobile Plant Interface 

Adhere to 3 Commandments:

  • Separate– Maintain a distance of at least 10m from mobile plant
  • Signal– Spotter or any other personnel wanting to approach mobile plant must signal to operator and wait for confirmation of the signal to enter 10m exclusion zone
  • System– Personnel working within or entering the 10m exclusion zone shall have an approved safe system of work with the mobile plant

Service & Inspection

  • Competent operator to complete and record Pre-start Inspections daily and prior to use
  • All identified defects in plant and equipment must be reported to the Supervisor
  • Servicing shall be completed and recorded at prescribed intervals
  • Operator to notify supervisor if operating hours/kms of mobile plant is approaching next due service
  • Plant shall not to be modified without engineering and registration process

Training & Competency

  • Operators must hold relevant ticket/license for the type of plant they are using
  • Where required by the client or project, a valid VOC for the plant shall be completed
  • Personnel undertaking maintenance of plant are to hold the relevant competency and training to perform work
  • When lifting loads >3T with earthmoving equipment and telehandlers with a jib, a High-Risk Work Licence (HRWL) is required

Standard Operating Conditions

  • Mobile Plant must be fitted with seatbelts, reverse alarm, flashing light, horn, fire extinguisher and first aid kit
  • Access and egress to allow for 3 points of contact to the cab
  • Assess fall from height risks for refuelling works
  • Apply correct loading and unloading processes for plant transportation
  • Operators to complete pre-start inspections and clean windscreen/mirrors of mobile plant prior to the first use of the day

PRO-HSEQ-07 Plant Management

Return to top


 

Electrical

Isolate, lock out, test for dead and only allow licensed electricians to work on electrical systems using compliant equipment and permits.

Electrical Hazards & Work 

Electrical Hazards and Work include:

  • Working on energised electrical equipment or installations
  • Working near electrical systems, such as:
    • Ground and wall penetration
    • Operating near power lines
  • Uncontrolled electrical energy release, such as:
    • Arc flash
    • Static electricity
  • Unsafe or improperly used electrical equipment or installations

Permits & Signage 

  • An Electrical work and Isolation Permit is mandatory for:
    • Low and high voltage electrical work
    • Performing electrical isolations
    • Electrical re-energisation
  • Obtain Network Operator permits/approvals for work within designated zones
  • Isolation signage with lockout devices to incl. ‘Personal Danger Tag’ and/or ‘Do Not Operate’
  • Display signage around exclusion zones for energisation/de-energisation work

Tools & Equipment/RCD’S

  • Elevate electrical leads with insulated hooks/stands
  • Use earthing for portable equipment and equipment that generates static electricity (e.g. Generators, blast and paint equipment)
  • Use RCDs with electrical equipment
  • Use correctly rated electrical equipment and leads for operating environment
  • Do not piggyback plugs or double adaptors, or piggyback leads through a RCD
  • Maximum of 40m extension lead length at 15 or 20Amp
  • Use insulated or non-conductive platforms/ladders for electrical work

Inspection & Testing

  • Quarterly Test and Tag of portable electrical equipment using the RGBY colour system
  • Annual Test and Tag required for office equipment and appliances
  • Test Transportable offices/crib rooms on a 6 monthly basis
  • Test Portable RCDs on a 3 monthly basis and push-button test daily (when connecting)
  • Users shall complete daily pre-start inspections of applicable electrical plant and equipment
  • Use Out of Service Tags and Quarantine areas for damaged or faulty items, and report to the Supervisor

Licenses, Certificates & Handover

  • Undertake electrical work with a suitably qualified Electrician (with an A Grade license for the type of work)
  • Company with an electrical contractor’s license only may perform electrical works
  • Electrical Supervisor shall sign off all electrical work conducted by apprentices
  • Provide a State/Territory regulator specific Electrical Compliance Certificate for wiring and installation work
  • Verify all applicable State/Territory regulator and electricity network operator handover requirements are completed (e.g. WA Preliminary Notice, Notice of Completion and Electrical Safety Certificate)

PRO-HSEQ-21 Electrical Safety

Return to top


 

Confined Space

Confined Space Entry (CSE) can only occur under permit with appropriate isolations, atmospheric testing, continuous monitoring, standby supervision and a verified rescue plan.

What Is a Confined Space (CS)? 

An enclosed or partially enclosed space that’s not intended or designed primarily for human occupancy, within which there is as risk of one or more of the following:

  • An atmosphere with unsafe oxygen levels
  • Contaminants present that may cause injury from harmful concentrations or fire/ explosion, e.g. Gases, vapours or dust
  • Engulfment

Controlled Access & Isolating Hazards

  • Approved Confined Space Entry Permit and Sign in/Out Register in place
  • ‘Danger! Confined Space -Entry by Permit Only’ signage to prevent unauthorisedentry (or similar)
  • Positively isolate the space from inflows, energy sources and potential contaminants
  • Control potential hazards introduced by work activities inside space, e.g.Hot Works

Atmospheric Testing & Monitoring

  • Atmospheric testing required prior to entry or re-entry, and recorded on the permit
  • Continual monitoring required for the time that a worker’s in the space
  • Testing done by a person holding a valid Gas Test Atmosphere competency

Communication & Monitoring

  • Prior to start, confirm communication process with personnel inside and out of the Confined Space
  • Standby person must never leave the entry point when workers are in the Confined Space, and must monitor workers without interference
  • Standby person must never enter the Confined Space for a rescue

Training & Competency

  • Entrants must hold valid Confined Space Entry qualification
  • Standby must hold valid Confined Space Entry qualification and Gas Test/ First Aid certifications
  • Supervisors of Confined Space work must hold valid Confined Space Entry qualification and Company Moodle
  • Where a rescue requires entry to Confined Space, the ERT must hold specific training

Emergency Response

  • Unless otherwise risk assessed, rescue to be done by Standby person from outside of the Confined Space
  • Standby person must never enter the confined space to undertake a rescue
  • Confined Space Rescue Plan to identify Emergency Equipment
  • Where ERT is needed for internal extraction, there shall be 1 Rescue person to every 4 persons inside the Confined Space

PRO-HSEQ-14 Confined Space

Return to top


 

Working Around Water

Assess and control risks when working around water, use appropriate PFDs and rescue equipment, implement safe systems for access, vessels, and emergency response.

Plan & Assess 

  • Work done in, on or near water must be risk assessed
  • A permit is required when, but not limited to:
    • Working from barge, vessel or boat
    • Working within 2m of exposed edge near water
    • Rope Access over water
    • Diving operations
    • Scaffolding works over water
  • An Emergency Rescue Plan must be developed to ensure there is a planned method of rescue

PFDs & Life Saving Equipment 

  • Annually inspected Auto-PFD Level 150 (minimum) to be worn when there’s a risk of falling into the water, including:
    • Working at Heights over water
    • Working <2m from open edge
    • EWP or Workbox over water (where assessed harness hook-up may not be required)
  • Emergency Rescue/Task Assessment to identify other equipment such as Life Rings, Whistles, Lights, Grab Hooks, Flares, Buoys etc.

Tools & Equipment 

  • Pneumatic and/or battery powered tools should be used
  • Where electrical equipment/leads are used, they must be:
    • Connected to RCD or earth leakage safety switch
    • Prevented from falling into water
    • Appropriately IP rated for liquid ingress
    • Inspected, tested and tagged
  • Permanently/temporarily installed equipment to be managed/maintained as per relevant standards, e.g. Winches and gensets

Vessels

  • Vessels must have appropriate Certificate of Survey (CoS), Certificate of Operation (CoO), Unique Vessel Identifier (UVI), VHF Radio, flares and other items (as required)
  • Vessel operating under an established and maintained Vessel Safety Management System (VSMS)
  • Operators to hold suitable competency for vessel class
  • All personnel to have induction/familiarisation to vessel
  • Continually monitor weather/sea conditions
  • Stability assessment for additional cargo handling, etc.

Diving Operations

  • Dive Plan, SWMS and Diving permit to be in place
  • Detailed Emergency Response assessment
  • Divers to have current (>12 months) medical fitness certification and relevant license as per AS/NZS 2299.1
  • ADAS Dive Supervisor to be present
  • Diver and competent dive attendants present
  • Pre-dive checklist and logs maintained
  • Display international code -A flag with all round visibility

PRO-HSEQ-25 Working Above, In or Near Water

Return to top


 

Hazardous Atmosphere

Assess exposure risks, provide appropriate ventilation and respiratory protection and eliminate ignition sources in hazardous atmospheres.

Planning & Monitoring

  • Hazardous Atmospheres include:
    • Contaminated: Harmful substances/materials cause heath issues when inhaled, e.g.Abrasive Blasting or Welding Facilities
    • Flammable: Gases, vapoursor combustible dusts in the air can explode/alight if ignited, e.g. Spray painting and flour silos
  • Assess atmospheric hazards before work starts and whenever conditions change. Continuously monitor known or potential hazardous atmospheres
  • Use calibrated monitors that are suitable for the anticipated contaminants and oxygen levels
  • Provide effective ventilation, control ignition sources and maintain emergency arrangements

Respiratory Protection

  • Use Respiratory Protective Equipment (RPE) for all activities that make harmful fumes or dust. Complete a risk assessment to decide the type of required respirator and filters
  • At a minimum, use the following RPE:
    • Abrasive Blasting: Supplied-air blast helmet with bib and cape
    • Airless Spraying: Half Face Respirator with A2 and P3 filters
    • Welding: Powered Air-Purifying Respirator (PAPR) Helmet with Particle Filter (HEPA/P3/P100 etc.)
    • Some activities in a confined space may require Supplied-Air Respirators, e.g. Welding

Ventilation

  • There are 3 ventilation types:
    • Local exhaust
    • Forced dilution
    • Natural dilation (least effective)
  • Base ventilation type on the activity and expected exposure
  • Ventilate chemical storage to prevent fume build-up
  • Conduct atmospheric monitoring where exposure levels may exceed Workplace Exposure Limits (WEL) to verify the effectiveness of ventilation and control measures

Standard Operating Conditions

  • Earth any Airless Spray units, Abrasive Blasting Units and Welding equipment
  • All electrical equip/installations in enclosures/buildings (with typically hazardous atmospheres) to be intrinsically safe, e.g. Blast and Paint sheds
  • Eliminate ignition sources from area and have adequate Emergency Response Equipment available
  • Verify WELs for the type of Hazardous Substances being used. Follow atmospheric and health monitoring requirements

PRO-HSEQ-40 Personal Protective Equipment

Return to top


 

Stored Energy and Pressure

Before working on any system, identify stored energy hazards, isolate and lock out energy sources, and verify the required controls are in place.

What is Stored Energy and Pressure?

  • Stored energy (or potential energy) is accumulated energy held by an object, plant or system, etc.
  • Stored energy may be present after shutdown and when systems are not actively moving or operational
  • Examples include pressure, hydraulic, pneumatic, mechanical, electrical, thermal and gravitational hazards
  • Consider systems with stored energy as ‘live’ until proven otherwise

Isolation Process

  • Isolate all energy sources using approved methods, Lock Out/Tag Out (LOTO) process and positive isolation wherever practicable
  • Where possible, establish two independent barriers against the release of hazardous energy
  • Control residual or stored energy through dissipation, restraint or other suitable means
  • Verify energy sources are isolated and/or controlled before work starts

Safe Systems of Works

  • Identify stored energy hazards during planning, risk assessment, SWMS and permit processes
  • Only authorised and competent persons may isolate or work on stored energy systems
  • Establish exclusion zones and line-of-fire controls where uncontrolled energy release could occur
  • Stop work if the isolation or energy control measures cannot be verified

Engineering Controls

  • Provide lockable and clearly labelled isolation points that are suitable for the energy type
  • Install engineered controls, e.g. Pressure relief valves, dump valves, interlocks, guards, restraints and blocking devices
  • Use rated components and fail-safe/load-holding mechanisms to prevent uncontrolled release
  • Maintain engineering controls as per manufacturer instructions and Australian Standards

Pressurised Equipment

  • Inspect, maintain and use pressurised equipment as per manufacturer requirements, e.g. Hoses, vessels, fittings, regulators
  • Fully depressurise, drain and vent systems before breaking containment. Verify zero pressure at the point-of-work
  • Fit and maintain restraints, whip-checks, guards and pressure-relief devices (where required)
  • Never exceed rated pressures or bypass safety devices

Emergency Response

  • Ensure emergency stops and other emergency controls are functional and accessible
  • Plan for isolation failure or loss of containment, including knowing the nearest available isolation point
  • Provide suitable containment such as earthed buckets or catchment trays, and ensure spill, fire and first aid equipment is readily available
  • Communicate emergency actions for stored-energy releases, leaks and injuries

Return to top


 

 

Live Services

Identify, isolate and protect all services using permits, exclusion zones and non-destructive methods before and during work.

Identifying Services 

Ensure services are identified using:

  • Before You Dig Australia (BYDA) services
  • As Built/As Constructed drawings or Master Site Plans
  • Electromagnetic cable locators or Ground Penetrating Radar (GPR)
  • Visually assess for indications of overhead, embedded and buried services within the vicinity of works
  • Verify using non-destructive methods, e.g. Potholing

Notifications & Isolations

  • Asset owner notification requirements met
  • Where possible, isolate or de-energise services prior to commencing works, e.g. Cutting, core drilling, excavation, working near overhead services, entering ceiling space
  • Every person working on isolated equipment shall fit their own lock and Personal Danger Tag
  • Test for dead prior to commencing works

Permits

  • Approved Permits for internal and third party (asset owner/client), including:
    • Excavation & Penetration
    • Ceiling Space Work
    • Electrical Work and Isolation
  • All personnel to sign onto Permit prior to works commencing

Overhead Power Lines

  • Approach distances and work zones A, B and C are established for working in the vicinity of overhead powerlines
  • Use physical barriers and signage to mark working zone
  • Use trained/qualified Safety Observer
  • Limit plant movement with mechanical stops and programmable zone limit devices
  • Insulated barriers placed on overhead lines
  • Use non-conductive tools

Underground Services

  • Use non-destructive methods for excavation, e.g. Hand digging or vacuum excavation >1500psi
  • Spotter in place at all times
  • If mechanical excavation is used to locate underground services, follow the below requirements:
    • Spotter to hand-dig down 100mm before an excavator digs (repeat)
    • Continue manual checks until service is found
    • Use insulated hand tools
    • Expose approximately 1m around service to check for other services

PRO-HSEQ-20 Excavation & Penetration | PRO-HSEQ-21 Electrical Safety

Return to top


 

Hazardous Materials (HM)

Identify hazardous materials, implement approved controls, use appropriate PPE, and ensure handling, monitoring, and disposal are undertaken by competent or licenced personnel as required.

Identify, Assess & Plan

  • Hazardous Materials include Asbestos Containing Material (ACM), silica, and hazardous coatings, e.g. Lead, chromium, arsenic
  • Sampling must be done and analysed by a NATA-accredited laboratory if required
  • Develop detailed management and control plans for all hazardous material works
  • Regulatory notification is needed for ACM removal and lead risk work in ACT, NSW, VIC, Comcare, SA and WA

Health Monitoring

  • Personnel undertaking works are subject to specific health monitoring
  • Intervals may vary depending on the type of material and results from baseline monitoring
  • All records are confidential and are only available to applicable personnel and the individual
  • Further action is required where results are outside the acceptable level or as advised by medical practitioner

Emissions Monitoring & Containment

  • Monitor emissions as per Australian Standards or Codes of Practice for the Hazardous Material
  • A competent person must verify levels are below workplace exposure standards
  • Use HEPA filter vacuums and ventilation systems to reduce airborne emissions
  • Develop a containment system that’s based on the method of removal or hazardous material type

PPE

  • Use respirators with the correct level of Protection Factor for the material and work required
  • Risk assessment used to determine the PPE type, e.g. Half face with specific filters, Powered Air Purifying Respirator (PAPR)
  • Other PPE:
    • Disposable coveralls
    • Boot covers or steel toe rubber boots
    • Safety Goggles

Licensing, Training & Competency

  • Asbestos Licences: Class A may remove friable and non-friable ACM. Class B may only remove non-friable ACM
  • Asbestos Competency: Asbestos removal workers and supervisors must hold the required regulatory training and competency
  • Silica Training: Workers undertaking silica works must complete applicable regulatory silica awareness training
  • Hazardous Coatings: Removal work must be supervised by a trained Responsible Person and completed by trained workers

Waste Removal & Clearance

  • Specific waste disposal requirements apply to Hazardous Materials. Laboratory testing may be required to classify waste and determine transport and disposal requirements
  • Specific containment with labelling of hazardous material type, e.g. Sealed, double wrapped at least 200μm thick with ‘CAUTION ASBESTOS’ or ‘HAZARDOUS WASTE’ for other materials
  • Final Clearance Inspections/Certificates by licenced and/or competent person

Return to top