...Recoating Rio Tinto Rail Bridge Remediation Rio Tinto Parker Point Diesel Tanks Coatings Rio Tinto Dampier Salt Wash Plant Refurbishment RTIO DSL Blast & Paint EMI Stacker Rio Tinto Cape...
Rio Tinto Parker Point Diesel Tanks Coatings
Duratec was engaged by Downer EDI to assist with surface preparation and external coatings. Details Rio Tinto’s Pilbara operations, including an integrated network of 15 iron ore mines, four port...
Rio Tinto Rail Bridge Remediation
Rio Tinto have engaged the services of Duratec to perform a variety of remediation techniques to refurbish rail bridges in the North West. Details The bridges are located on Rio...
Woodside and Rio Tinto projects up and running
...Tom Price high-grade screen house structural integrity project for Rio Tinto. While the KBSB is Duratec’s first major contract with Woodside, the Pilbara team is already well acquainted with Rio...
Rio Tinto Dampier Salt Dry Salt Dump Bridge Concrete Repairs
Duratec was engaged by Rio Tinto (DSL) to conduct concrete repairs to the Dry Salt Dump Bridge abutments at Lake MacLeod. Details The repairs totalled 60m2 and were to be...
Rio Tinto Cape Lambert CD2 Rail Refurbishment
Duratec was engaged to replaced five car positioner rail base plates for Rio Tinto at their Car Dumper 2 (CD 2) facility at Cape Lambert. Details The eight-day shutdown involved...
Rio Tinto Iron Ore Fuel Band Audit
Duratec was engaged to audit the condition and compliance of concrete and earth containment bunds for Rio Tinto Iron Ore on several sites in the north west of WA. Details...
Rio Tinto Yandi Corrosion Repairs
...to remove iron ore from steel surface. Abrasive blast of structural steel on head end primary structure of reclaimer, areas of slew drive and bracing connections. Liaised with Rio Tinto...
Rio Tinto Dampier Salt Wash Plant Refurbishment
Duratec was selected by Rio Tinto Dampier Salt Ltd (DSL) to install a high performance corrosion protection system and perform concrete repairs at their Dampier wash plant. Details The plant...
Rio Tinto Dampier Salt Mooring Dolphin Repair Project
Mooring Dolphin Repairs and Fender Upgrade. Details The dolphin repair project included: hydro-demolition of concrete; reinstatement with gunite; removal and replacement of the fenders; installation of a hybrid CP system...
Rio Tinto Dampier Salt Twin Boom Stacker Refurbishment
Complete blast and paint repair works to a twin boom stacker located at their Port Hedland operations. Details The works involved the removal of lead containing coatings from the stacker...
Rio Tinto Substation Fireproofing Cape Lambert
Duratec was engaged by RTIO to fireproof 26 substations at Cape Lambert Port A, 16 substations are currently complete with 10 more to be completed at a later date. Details...